53 Type V Permit Application   Type V Permit Application
52 Gasoline Pipeline Release Site Remediation Environmental Assessment for Implementation of the Response Action Plan at a Gasoline Pipeline Release Site, Fort Bliss, Texas EA
Draft FNSI
Notice of Availability
51 Revision of the Local Flying Rules EA Environmental Assessment for the Modification of Fort Bliss Local Flying Rules, Fort Bliss, Texas and New Mexico EA
Final FNSI
Notice of Availability
Revised NOA
Public Meeting Notice 12/05/2017

50 Area of Interest North of Castner Range • TPP Meeting #1 TPP Meeting #1 Minutes | TPP Meeting #1 Slides
49 ICRMP EA Environmental Assessment and Draft Finding of No Significant Impact for the Integrated Cultural Resource Management Plan, Fort Bliss, Texas & New Mexico ICRMPEA & Final FNSI
ICRMP
48 Fort Bliss - Former Maneuver Area Site Inspection Report   Former Maneuver Area Site Inspection Report
Former Maneuver Area A Public Meeting Nov 2016
Fort Bliss Final Feasibility Study
47 Ordnance and Explosives (OE) Characterization and Cost Analysis Report for Fort Bliss Castner Range Revised Final, May 1998 OE Characterization and Cost Analysis Report
46 HAMETS EA Off-Post and High Altitude Mountain Environment Training Strategy Helicopter Operations, Fort Bliss, Texas and New Mexico Environmental Assessment - Scoping documents Signed HAMETS Scoping Letter

Legal Notice announcing Scoping
(19 June thru 20 July 2016)


HAMETS Presentation

HAMETS Proposed Helicopter Landing Zone Map
45 Final INRMP - 2016 Fort Bliss TX & NM Integrated Natural Resources Management Plan – February 2016 INRMP Final

Appendices
44 Closed Castner Range Castner Range Explosive Safety Submission Ordnance and Explosive Report - November 2002 Explosion Impact Distances
ESS OE Removal Action
Addendum 1OE Removal
43 Restoration Advisory Board Meeting March 9, 2016
March 28, 2017
Restoration Advisory Board Meeting
March 28, 2017 RAB Slide Presentation
42 Closed Castner Range Final Incremental Sampling Methodology (WAA) June 2013 Closed Castner Range Final Incremental Sampling Methodology
41 Closed Castner Range Final Wide Area Assessment (WAA) Field Demonstration Report July 2012 Closed Castner Range WAA Field Demonstration Report
40 Closed Castner Range Final Site Inspection Report January 2007 Closed Castner Range Final Site Inspection Report
39 IPMP Integrated Pest Management Plan IPMP Final
38 Closed Castner Firing Range Remedial Investigation • TPP Meeting #4
• TPP Meeting #3
• TPP Meeting #2
• Public Meeting #1
• Public Meeting #2

• Newsletter - June
• Newsletter - July
• Newsletter - August
• Newsletter - September
• Newsletter - October
• Newsletter - Nov/Dec
TPP Meeting #4 Slides
TPP Meeting #3 Slides | TPP Meeting #3 Minutes
TPP Meeting #2 Slides
Public Meeting #1 Slides | Public Meeting #1 Minutes
Public Meeting #2 Slides

Closed Castner Range Update - June 2015
Closed Castner Range Update - July 2015
Closed Castner Range Update - August 2015
Closed Castner Range Update - September 2015
Closed Castner Range Update - October 2015
Closed Castner Range Update - November/December 2015
37 2015 Integrated Natural Resource Management Plan (INRMP) • Environmental Assessment
• Draft Finding of No Significant Impacts (FNSI)
Environmental Assessment & Draft FNSI
36 Southern New Mexico – El Paso Joint Land Use Study Land Use study, technical report back-ups, Economic study, and public meeting summary. SNMEP JLUS Main Report
SNMEP JLUS Main Report Technical Appendix
SNMEP JLUS Existing Conditions Report
SNMEP JLUS Existing Conditions Executive Summary
SNMEP JLUS Existing Conditions Technical Appendix
SNMEP JLUS Economic Impact Study
SNMEP Compatibility Strategy Menu
SNMEP JLUS Public Meeting Summary
35 Fort Bliss Landfill Permit Modification July 2014   Draft
34 Supplemental Programmatic Environmental Assessment for Army 2020 Force Structure Realignment and Draft Finding of No Significant Impact Supplemental Environmental Assessment (EA) document including a Draft Finding of No Significant Impact (FNSI) SPEA
Final FNSI
Final FNSI NOA
33 Environmental Assessment for Fighter Aircraft Use of Biggs Army Airfield for Joint Forces Training, Fort Bliss, Texas and New Mexico Environmental Assessment (EA) and Draft Finding of No Significant Impact (FNSI). EA
FINAL FNSI
32 Environmental Assessment of Proposed Installation and Operation of Solar Photovoltaic Systems, El Paso Veterans Affairs (VA) Health Care Center Environmental Assessment (EA) and Draft Finding of No Significant Impact (FNSI) EA & Draft FNSI
31 EIS for the Implementation of Energy, Water, and Solid Waste Sustainability Initiatives (Net Zero) at Fort Bliss, Texas   NOA Record of Decision
Final EIS Record of Decision
Final EIS
30 Environmental Assessment for the Unmanned Aerial Systems Complex,
Fort Bliss, Texas and New Mexico
  EA and Final FNSI
29 Environmental Assessment for the Construction and Training Use of Sacramento Mountain Villages,
McGregor Range, Fort Bliss, New Mexico
  Final FNSI and EA
28 Army 2020 Stationing Programmatic Environmental Assessment for Army 2020 Force Structure Realignment - Sections pertaining to Fort Bliss Final PEA & FNSI - 1
Final PEA & FNSI - 2
Final PEA & FNSI - 4
Final PEA & FNSI - 5
27 Environmental Assessment and Draft FNSI for U.S. Immigration and Customs Enforcement El Paso City Administrative Facility, Fort Bliss, Texas   Final FNSI & EA
26 Environmental Assessment and Draft FNSI for the Sale, Development and Exchange of Army-owned Land, Fort Bliss, Texas   Final FNSI & EA
25 Final Environmental Assessment for Solar Facilities on the Training Ranges, Fort Bliss, TX and NM   Final FNSI and EA
24 Contruction and Training Use of a Multipurpose Machine Gun Range and a Grenade Launcher Range at Fort Bliss, Texas -Environmnetal Assessment (EA) -Final Final FNSI and EA
23 Implementation of a Military Vehicle Fueling Plan on Fort Bliss, Texas and New Mexico - Draft Environmental Assessment (EA)

- Draft Finding of No Significant Impact (FNSI)
Final FNSI and EA
22 Environmental Assessment Modification of Special Use Air Space
Fort Bliss, Texas and New Mexico

Final EA

Final FNSI and EA
21 EA for Construction and Operation of JLENS Tactical Training Sites on McGregor Range Final Environmental Assessment & FNSI Final EA
20 Council on Environmental Quality, Executive Office of the President A Citizen's Guide to the NEPA https://ceq.doe.gov/nepa/Citizens_Guide_Dec07.pdf
19 Fort Bliss Water Services Company 2011 Water Quality Report 2011 Report
18 EA for Privatization of Army Lodging on Fort Bliss
  • Privatization of Army Lodging on Fort Bliss Environmental Assessment
17 Castner Range Information
  • Castner Range Information
16 Fort Bliss Restoration Advisory Board (RAB) Fort Bliss RAB Documentation Fort Bliss Restoration Adivsory Board (RAB) Meetings -- RAB.zip
15 EA for El Paso Community College at Fort Bliss
  • Environmental Assessment
  • FNSI
14 EA for Hospital Replacement
  • Environmental Assessment
  • FNSI
13 EA for Obscurant Munitions Training at FB
  • Environmental Assessment
  • FNSI
12 Grow the Force (GFS) Realignment EIS
  • • Final EIS

  • • Record of Decision

11 Orogrande Quarry EA
  • Final EA & FNSI
Link to EA
10 Final  SEIS
  • Final Supplemental Programmatic Environmental Impact Statements

  • Final Notice of Availability
  • 9  
    • Record of Decision
    8 Border Patrol Station on Castner Range EA • Draft EA and 2004 Final Decision Document
    7 DESAL EIS
    • Final EIS
    6  
    • Summary EIS
    5  
    • Record of Decision
    4 MMPEIS  
    3 Army Transformation  
    2 ICRMP Cultural Resources Management on Fort Bliss
    1 1999 McGregor Range, New Mexico Land Withdrawal Renewal Legislative Environmental Impact Statement
    • • Volume I
      • Volume II
    McGregor LEIS Volume I
    McGregor LEIS Volume II